CIP FY 2024
Project Number: CB-2365
Funding Source: Water Utilities Capital
Location: FM1148 between Highway 67 and Possum Kingdom Lake
Budget: $3,600,000.00
Type: Drought Response Pipeline Construction
Start Date: October 1, 2023
Completion Date: TBD
Details: This project includes the installation of about 15,000 linear feet of 12” diameter pipeline. The City holds a Texas Pollutant Discharge Elimination System permit with the TCEQ authorizing the discharge of reverse osmosis concentrate produced by the Possum Kingdom Raw Water Roughing Facility (PKRWRF) back into Possum Kingdom Lake.
Status: Bidding
| | | | | | |
Programmed | Feasibility | Pre Design | Design | Bidding | Construction | Closeout |
Last Project Update: 8/22/23
Project Contacts:
- Katherine Beeman, Project Manager 325-725-3415
- Kent Hackworth, Project Inspector 325-725-3589