Transportation Services

Accomplishments for 2023

Abilene Regional Airport

Renovations

  • Completed Terminal Lower Level restroom renovations, including adding an Assisted/Family restroom and painting interiors.

Travel

  • Passenger Enplanements were higher than 2022
  • American Airlines added two new daily departures to Dallas-Fort Worth.

Expansion and other items

  • Began design of the Terminal Expansion and Improvements Project.  
  • Began design of a new aircraft ramp for use by the Texas Forest Service. 
  • Closed Passenger Facility Charge 3 and successfully activated PFC 4.
  • Closed out three Federal Aviation Administration grants.

CityLink

  • Began on-demand service that replaced the Route 10 bus. 

Fleet

  • Maintained overall City fleet availability above 97%.
  • Installed 515 telematics devices and began gathering real time vehicle usage data.
  • Achieved <1% repeat repair rate.