Technical Specifications

  1. Division I - Earthwork
  2. Division II - Sub Base & Base Courses
  3. Division III - Surface Courses or Pavement
  4. Division IV - Structures
  5. Division V - Incidental Construction
ItemSpecification
Item 100 - Prepare Right of Way100-1 (PDF)
Item 103 - Creek Cleaning103-1 (PDF)
Item 104 - Removing Concrete104-1 (PDF)
Item 105 - Wire Fence105-1 (PDF)
Item 106 - Obliterating Abandoned Road106-1 (PDF)
Item 107 - Seeding for Erosion Control107-1 (PDF)
Item 108 - Removing Stabilized Base and/or Asphaltic Pavement108-1 (PDF)
Item 110 - Excavation110-1 (PDF)
Item 112 - Subgrade Widening112-1 (PDF)
Item 132 - Embankment132-1 (PDF)
Item 134 - Backfilling Pavement Edges134-1 (PDF)
Item 150 - Blading150-1 (PDF)
Item 152 - Road Grader Work152-1 (PDF)
Item 154 - Scraper Work154-1 (PDF)
Item 156 - Bulldozer Work156-1 (PDF)
Item 158 - Specialized Excavation Work158-1 (PDF)
Item 160 - Furnishing and Placing Topsoil160-1 (PDF)
Item 162 - Sodding for Erosion Control162-1 (PDF)
Item 165 - Rock Filter Dams for Erosion and Sedimentation Control165-1 (PDF)
Item 167 - Earthwork for Erosion Control167-1 (PDF)
Item 168 - Vegetative Watering168-1 (PDF)
Item 169 - Soil Retention Blanket169-1 (PDF)
Item 170 - Irrigation System170-1 (PDF)
Item 180 - Wildflower Seeding180-1 (PDF)
Item 192 - Roadside Planting and Establishment192-1 (PDF)
Item 193 - Landscape Maintenance193-1 (PDF)
Item 200 - Subgrade Preparation200-1 (PDF)
Item 201 - Rehabilitate Existing Base201-1 (PDF)
Item 202 - Geogrid Reinforcement202-1 (PDF)
Item 203 - Rolling203-1 (PDF)